IMACS Optics Fabrication Progress

 

Collimator as of March 2000: Collimator optical fabrication at TORC is complete. The glass elements are at Newport Thin Films Lab for coating. C02 and its coating tooling can be seen in the images below. The CaF2 element is at Spectrum Thin Films for coating.

Long camera as of March 2000: Long camera optics fabrication at TORC is complete except for 1-2 surfaces.

Short camera as of March 2000: Epps has completed the nominal construction design. Fabrication of the spherical surfaces is planned at TORC, aspheric surfaces is planned at REOSC.

(Some images can be clicked on to view a larger version)


Collimator Element C02

1

C02 sits on a lab jack, ready for mounting in coating tooling.


Collimator Element C02

2

C02 and installation of coating tooling.


Collimator Element C02

3

Detail of flexure support for lens.


NTFL tooling

4

Flexure-support coating tooling.


NTFL tooling

5

C02 and C03 coating tooling.


Collimator Element C05

6

Collimator element C05 almost finished at TORC. Blue color is a protectant.


Collimator Element C04

7

Collimator element C04 almost finished at TORC. Blue color is a protectant.


Collimator Element C03

8

Collimator element C03 finished at TORC. Blue color is a protectant.


Dewar Test Window

The IMACS dewar window has optical power, which makes it unsuitable for optical testing of array flatness. A flat dewar window has been fabricated to allow testing during the assembly of the array.

9


Imaging Mirror

The imaging mirror reflects the 15 x 15 arcmin FOV into the long camera. This mirror was coated by Newport Thin Films.

10



Updated on Friday, February 22, 2002 imacs@obs.carnegiesciene.edu

 